- Alternative Energy Generators[9]
- Motor Graders[2]
- Tractors[9]
- Excavators[5]
- Cranes[10]
- Loaders[7]
- Hydraulic Tools[3]
- Work Platforms[8]
- Cleaning Equipment[10]
- Other Construction Machinery[5]
- Cleaning Tools[4]
- Grass Trimmer[3]
- Asphalt Mixers[8]
- Cargo Truck[1]
- Dump Truck[1]
- Tow Truck & Wrecker[2]
- New Cars[2]
- Diesel Generators[7]
- Compactors[3]
- Concrete Pumps[3]
- Forklifts[7]
- Harvesters[7]
- Road Roller[3]
- Pumps[1]
- Special Transportation[1]
- Paper & Paperboard Printing[1]
- Other Farm Machinery[2]
- Contact Person : Mr. Wang Henry
- Company Name : Jiangsu Lionkin Industrial Co., Ltd.
- Tel : 86-515-88363921
- Fax : 86-515-88368389
- Address : Jiangsu,Yancheng,12 East Yanhe Rd.,
- Country/Region : China
- Zip : 224005
KAIFAN KFM-EBZ220Y ROADHEADER
A.Working Range
EBZ200H is powerful hard rock tunnel boring heavy machine which has effective driving and powerful cutting function. KaiFan Brand Coal Boring Machine can be applied in various conditions for coal boring, such as solid road, mixed coal-rock, soft rock and so on. It could also work on railway, highway, hydraulic engineering and other tunnels. Its cutting hardness is 100mpa and grade is ±18°.
B.Features
This machine adopts double-quantitative pump, hydraulic control pilot and electronically control valve to ensure the equipment could use in normal and special conditions. Low speed high torque motor effects to reduce the failure rate; shunt valve guarantees synchronism operation of star wheel, first transport and driving motor, meanwhile removing the shunt and reducing the failure rate; driving motor, reducer, brake, brake valve and reducing valve integrate into one compact form which easy to instal; the system uses imported hydraulic components which has low uninstall features, reducing working load and caloric value, delaying the fuel aging, improve fuel working life; centralized lubrication oil ensures the working simplified to the device much easier to suit different conditions.
C.Main Parameters
Items | Value |
External dimension | 11.2×3.0/3.6×1.86m |
The whole weight | 80t |
Max. Boring height | 5.1m |
Max.Boring width | 6.0m |
Grade ability | ±18° |
Ground clearance | 285mm |
Ground rip depth | 230mm |
Grounded pressure | 0.156mpa |
Can / economic cutting rock unidirectional compressive strength | ≤100/80mpa |
Cutting motor power | 200/150kw |
Cutting head speed | 47/23r/min |
Extension quality of cutting head | Fixed |
Walking speed | 0-7m/min |
Track width | 650mm |
Loading type | Six-claw-Star Wheel |
Loading ability | 4.3m3/min |
Delivery type | Bilateral double chains scraper type |
Delivery chains speed | 60m/min |
Max. Non-removing parts size | 3.5×1.57×1.47m |
Max. Non-removing parts weight | 8.1t |
Pump motor power | 132kw |
Fuel tank volume | 680L |
Spray water pressure (outside) | 1.5mpa |
Spray water pressure (inside) | 3.0mpa |
Supply water quantity | 120L/min |
Rated total power | 343kw |
Supply voltage | 1140V |
D.Equipments Introduction
1. Cutting head
Cutting teeth Cutting telescopic partCutting speed reducerStar wheel motorStar wheelApron Driving speed reducerFirst transport motor10. First transport boom plates
11. Track assembly
12. Rotation support
13. Bearing
14. Flame-proof of three-phase motor
15. Mine flame-proof electronic control box
16. Mine flame-proof control box
17. Mine flame-proof sensor
18. Mine methane sensor
19. Gas alarm outage machine
20. Auxiliary relay
21. Mine flame-proof light
22. Mine flame-proof emergency stop button
23. Mine flame-proof double-hit bell
24. PLC controller
25. Dual hydraulic pump
26. Multi-way reversing valve
27. Balance valve assembly
28. Hydraulic handle
29. Filter assembly
30. Oil-level gauge
31. Coupling
32. Hydraulic hose
33. Hydraulic joint
34. Hydraulic tank
35. Two-story steel hose series assembly
36. Mobile light flexible rubber-sheathed cables
37. Oil coolers
38. Nozzle
39. High strength mining round link chain
40. Opening ceremony connecting ring
41. Floating steal
42. OR rotating steal
43. Flexible cables with screens
E.Payment Terms:
30% deposit by T/T in advance, and the balance 70% by T/T 15days before the vehicle departures the factory or 100% irrevocable L/C at sight and the relative clauses should be confirmed by The Seller, But for L/C, the price need to be 2% higher for funds interest, and LC operation.
F.Production Time:
30 working days after we get 30% advance payment or irrevocable L/C at sight.
KAIFAN KFM-EBZ220Y ROADHEADER